Follow Us

 

Our Services

Concept is one of the UK’s leading property service specialists, delivering expert property maintenance, refurbishment and compliance across the UK.

View All Services

Frameworks

A close-up of a Vaillant aroTHERM plus Air Source Heat Pump (ASHP) unit, professionally installed for a residential property against a red brick wall.
Home | Case study | Residential Air Source Heat Pump Installation

Residential Air Source Heat Pump Installation

Sector

Social Housing

Location

East of England

Service

Decarbonisation

Axis undertook a residential air source heat pump (ASHP) installation for our client Eastlight Community Homes for social housing residents in Braintree, Essex. This initiative aimed to reduce energy consumption and energy bills for residents.

Eastlight Community Homes

Our residential air source heat pump installation, enhanced energy efficiency and comfort for social housing residents

Project Details

The properties, owned and managed by Eastlight Community Homes, included three family homes and one bungalow housing an elderly resident. The previous system was outdated, lacked advanced controls, and operated inefficiently, often creating excessive noise.

We began with thorough property surveys, focusing on heat loss, radiator capacity, and pipework requirements. Performance projections were developed based on Energy Performance Certificate (EPC) data, enabling us to create a custom design. This included enhanced heating zones, expanded pipework and larger radiators to support efficient heating distribution.

Our M&E team removed the outdated ASHP units and replaced them with state-of-the-art equipment, including the Vaillant aroTHERM ASHP, uniSTOR heat pump unvented cylinder, buffer unit and sensoCOMFORT controls. These modern features include remote access, real-time temperature sensors, and thermostats for improved usability. We also installed Grundfos pumps and Honeywell valves to ensure long-term reliability and performance.

The new ASHP system, with a high Seasonal Coefficient of Performance (SCOP) at a 45°C flow temperature, offers efficient heating and hot water with real-time control adjustments. This reduces energy usage, cutting heating costs by an estimated 1,400 kwh annually.

Benefits

  • Minimised energy consumption
  • Reduced energy bills
  • Future proofing
  • Uninterrupted heating and hot water service
  • Reduced carbon footprint

Residential Care

Our team kept in regular contact with our residents before and during works, we also had a supervisor on-site to communicate and answer any questions raised.

Client Relationship

Under the 2-year renewables contract with an indicative value of £500,000 per annum, we will be decommissioning existing oil, gas and electric systems and installing new Air Source Heat Pump (ASHP) systems. Since September 2023, we have completed a total of 6,114 services.

Specifications

  • Strip out and removal of unit
  • Fit unvented cylinder
  • Build new concrete base for new unit
  • Fit out internal pipework
  • Electrical works
  • New ASHP installation

It was all good, professional and friendly we were always pre warned about work since the install. It’s been very warm here, best we have had in the 11 years we’ve been here

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.