Alford Schools of Military Music - Refurbishment 

Sector

Defence

Location

South East

Service

Refurbishment

As Concept, we undertook a comprehensive refurbishment of the Royal Marines School of Music within Portsmouth Dockyard. The scope covered the ground, first, and second floors, with a full strip-out to enable structural repairs and a complete internal refurbishment. We strengthened and restored floor and wall structures and completed extensive roof works across the lower, top, and barrel roofs. This included the removal of existing materials, treatment, insulation, and installation of new roof lights to improve daylight and reduce energy demand. 

We restored the external fabric through brickwork repointing, patch repairs, and concrete repairs. We refurbished or replaced UPVC windows, cills, and façade elements to improve appearance and thermal performance. Internally, we installed new ceilings, floor finishes, doors, kitchen units, and sanitaryware. We completed new mechanical and electrical systems to meet current standards. We rebuilt external ramps and upgraded the main entrance to improve access and safety across the site. 

What we did

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Specifications

  • Full strip-out and internal reconfiguration across three floors
  • Structural repairs to floors and walls
  • Roof repairs to lower, top, and barrel roofs with new insulation
  • New roof lights to improve daylight
  • External fabric repairs, including brickwork and concrete
  • Refurbishment and replacement of UPVC windows and cills
  • New internal ceilings, flooring, doors, kitchens, and sanitaryware
  • Complete mechanical and electrical installations
  • Rebuilt external ramps and improved main entrance access

Project Overview

Number of months

18

Contract Value

£

7

M

The site remained operational throughout the works, which required strict controls and clear sequencing. We planned the programme in phases to protect access and safety while keeping activities running. This approach reduced disruption and supported reliable handovers. 

Working within a historic dockyard setting required care to balance upgrades with heritage features. We coordinated trades closely and applied appropriate repair methods to retain character while delivering modern performance and compliance. 

Innovations, challenges, solutions

Maintained programme certainty within a live defence environment through phased delivery and close coordination.

Have a project to discuss?

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents