Follow Us

 

Our Services

Concept is one of the UK’s leading property service specialists, delivering expert property maintenance, refurbishment and compliance across the UK.

View All Services

Frameworks

Grey tiled roof with windows
Home | Case study | Alliance Norse – Automatic Opening Vent Installation

Automatic Opening Vent Installation

Sector

Retail & Commercial

Location

East Midlands

Service

Active Fire

For Alliance Norse, Fieldway installed automatic opening vents (AOVs) at Glossop Market Hall, a Grade II listed building in Derbyshire.

The works included replacing existing roof windows with 12 Lamilux AOVs and creating eight new openings in the slate roof for additional AOVs.

We also included roof reinforcement, lead flashing and internal finishes sympathetic to the listed building.

Alliance Norse appointed Fieldway following a direct award through the Efficiency East Midlands Framework.

.

What we did

Fieldway installed automatic opening vents at Grade II listed Glossop Market Hall in Derbyshire to improve fire safety and smoke ventilation.


Working within a live, historic market hall presented a number of challenges, but Fieldway consistently approached these with professionalism and flexibility. The project was delivered safely, with minimal disruption to occupiers and the finished installation provides an important improvement to the building’s fire safety while preserving its heritage features. We were pleased with the collaborative way the team worked throughout the project – Mark Walster

Project Surveyor

Norse Group

It was a privilege to be part of an amazing day with the inspiring and dedicated team from Axis CLC. Huge success

Integration Manager

Central London Forward

Thank you so much Axis for your sponsorship again this year, it’s a lifeline for the event and so appreciated.

Relationship Manager for Sport

Active Westminster

Axis worked closely with us throughout the project to deliver a high-quality refurbishment that has created safe, modern and comfortable accommodation for our residents. The team understood the requirements of the scheme and worked collaboratively to ensure the project was completed to a high standard.

The refurbishment has made a real difference to the young people we support and has given colleagues the space they need to work effectively on site.

Marc Pearce-Fulker, Senior Development Manager

Peabody

Specifications

  • Lamilux AOVs
  • New roof openings
  • Slate roof reinforcement
  • Lead flashing reinstatement
  • Automatic Opening Vents (AOVs)
  • Key switch controls
  • Internal timber finishes
  • Existing roof window removal
  • System testing, commissioning and integration

Project Overview

Programme duration

6

Weeks

Defect period

12

Months

AOVs installed

20

+

Roof windows replaced

12

Project value

£

193

k

Fieldway installed a full scaffold system with boarding, brick guards and netting to safely separate the works from the public.

We carefully monitored weather conditions because roof works involved lifting heavy glass by crane.

And we used temporary protection during light rain to maintain safe lifting conditions and programme progress.

Innovations

Working at height in a live Grade II listed building required careful planning around public safety, weather and the building’s heritage features.


Weekly on-site progress meetings, Teams calls, phone calls and emails supported clear communication with Alliance Norse.

A fully boarded scaffold birdcage, brick edge protection and netting helped protect shoppers and the public from falling debris.

Care and Communication

Careful planning and protection allowed the Market Hall to remain open while works took place above the public.


  • Improved fire safety and compliance
  • Safer evacuation routes
  • Natural smoke extraction
  • Improved mezzanine fire safety
  • Manual ventilation capability
  • Improved air quality
  • Support for Building Control sign-off
  • Support for Fire Brigade requirements
  • Heritage-sensitive installation
  • Local supply chain
  • 12-month defects period
  • Maintenance contract offered after defects period

Benefits

Improved fire safety and smoke ventilation guarantees a safer shopping experience and compliance.


Read the Case Study

Colleagues engaging in conversation at a project site, representing equality in the workplace.

Have a project to discuss?

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Grey slate tiled roof with windows

Alliance Norse – Automatic Opening Vent Installation

Fieldway completed the Automatic Opening Vent Installation for Alliance Norse at Grade II listed Glossop Market Hall in Derbyshire, improving...

Fieldway

Wigan Council – High-Rise Fire Safety Retrofit

Fieldway delivered a multi-disciplinary fire safety retrofit programme across seven high-rise blocks, improving safety and compliance for more than 700...

Refurbishment – Buckley Barracks

Refurbishment of the Junior Ranks Dining Hall at Buckley Barracks, delivering a modern and durable facility for military personnel.

New Depot – National Grid

Delivered the full fit-out, M&E installation and welfare facilities for a new office depot for National Grid in Torquay.

Refurbishment – Mablethorpe Environment Agency Depot

Delivery of a comprehensive internal refurbishment of an operational Environment Agency depot to modernise the facility and create a compliant,...

Refurbishment – Elizabeth Barracks

Delivery of a full refurbishment of the dining facility at Elizabeth Barracks, applying our expertise to create a modern, durable,...

Refurbishment – St George’s Church

Delivering a comprehensive refurbishment and lifecycle upgrade while safeguarding the church’s historic character.

Refurbishment – Crisis Suite

We delivered the full refurbishment and reconfiguration of an occupied office space to create a dedicated crisis communication and media...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.