Home | Case study | Replacement Heating System – ASHPs

Replacement Heating System – ASHPs

Sector

Social Housing

Location

London

Service

Decarbonisation

Axis’ M&E Division was contracted to replace the central gas boiler plant with a new air source heat pump system (ASHP) at Fountain Court, Royal Borough of Kingston’s (RBK) housing-with-care property.

Royal Borough of Kingston

We upgraded a residential property in Kingston with energy-efficient heat pumps, solar panels, and a new LTHW system.

Project Details

Axis’ M&E Division was contracted to replace the central gas boiler plant with a new air source heat pump system (ASHP) at Fountain Court, Royal Borough of Kingston’s (RBK) housing-with-care property.

This is a fully-occupied, two-storey residential building which includes 29 flats, kitchen and bathroom/shower rooms, a communal lounge area, and two laundry rooms.

Three new 41kw Bosch Air Source Heat Pumps were installed to supply heat through the plant room to HIUs in 29 flats and 5 HIUs in communal areas. Two are working full time, one is for back up. We installed them at the rear of the communal garden in a brick-built acoustic enclosure especially designed to reduce noise pollution for residents and neighbours, and ensure compliance.

In addition to the new ASHPs we installed new Heat Interface Units (HIUs) within each apartment and a new Low Temperature Hot Water (LTHW) system throughout.

We completely stripped the plant room of the existing boilers (which were approaching end of life) and their associated controls. We removed all the existing radiators in the flats and communal areas. New distribution pipework was installed to run from the roof space into each apartment, the communal areas and the plantroom.

Two new 800l buffer vessels store hot water for the HIUs. And a new cold water booster system ensures good water flow for residents, while new pressure units keep the pressure system topped up at all times.

Additional works included the installation of a new Building Management System (BMS) which we can access remotely to maintain, new emergency lighting and new fire alarm devices to the plant room.

We also added solar panels which generate enough electricity for the communal areas, immersion heaters as well as feeding buffer vessels.

Since installation (in November 2024) the solar PV system has generated 1.2MW of energy which is approximately 20% more than anticipated for this time of year. During daylight periods the PV is providing 76% of the required energy for the property. Where there is surplus energy the battery is being used on average 5.6%.

PV installation report, February 2025

Benefits

  • Solar panels provide 76% of required energy
  • Energy-efficient heating and hot water
  • Reduced energy costs
  • Helps client with Net Zero targets
  • Reduced carbon emissions
  • Fully electric property (no gas)
  • Enhanced safety
  • More control for residents
  • Consistent hot water supply
  • Improved pressure in water supply
  • Reduced service charges

Residential Care

Throughout the works we took great care to keep our residents – some are elderly and vulnerable – well informed of our progress through frequent newsletters and via our manned on-site office.

We installed a temporary gas boiler so residents had heating and hot water for the whole duration of the works and we also distributed temporary heaters.

We kept our site tidy – where redundant materials could not be removed daily, we provided a lockable skip. These measures ensured we did not restrict access or free movement for residents to the various buildings, while barriers and signage kept them safe from our working areas too.

The site also featured Heras fencing with a lockable gate to provide extra security and peace of mind for residents.

At Christmas we invited everyone at Fountain Court to share a Fish and Chip supper with us to celebrate the festive season – and their improved heating and hot water system!

Our Client

Axis has conducted planned and responsive repairs programmes for RBK since 2013. Most recent similar projects include an air source heat pump installation at Four Oaks and a communal boiler replacement at Charles Lesser House.

Shortlisted for Award

We’re delighted that we are finalists at 2025 HVR Awards for this project with Worcester Bosch in the Collaboration of the Year category.

Specifications

  • Strip out
  • Solar PV panels
  • 3 41kw Bosch Air Source Heat Pumps
  • 34 Heat Interface Units (HIUs)
  • Low Temperature Hot Water (LTHW) system
  • 2 800l buffer vessels
  • Acoustic enclosure
  • Cold water booster system
  • Distribution pipework
  • Pressure units
  • Remote access BMS

I am very impressed by what I have seen today. This is the kind of programme we can run across the whole of Kingston. It’s very efficient. It means it’s all electrical and we don’t have to have any gas here.

Councillor Ian Manders, Portfolio Holder for Climate Action

Biodiversity and Planning Policy, RBK

They’ve done a lovely job, very professional. We are very happy. It’s much warmer. It’s good for the people of Kingston. It should be put out more

Resident

Working with Axis has been extremely beneficial to some of the residents here. Axis have been accommodating to their vulnerabilities… and we’ve had some really good comments and praise from the staff here.

This has been a very successful arrangement, and we are looking to build on this relationship with Axis.

Paul Dunkerton

Lead Officer, Assets and Compliance, RBK

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.