Follow Us

 

Our Services

Concept is one of the UK’s leading property service specialists, delivering expert property maintenance, refurbishment and compliance across the UK.

View All Services

Frameworks

Home | Case study | Hyde

Re-cladding to 5 tower blocks

Sector

Social Housing

Location

South East

Service

Building Compliance

Before installing the new cladding system, our Design and Build contract saw us co-ordinating specialists and experts to deliver a suitable cladding design. Detailed intrusive surveys helped diagnose the original substrate and structure of each block. This ensured the new cladding would be compliant and protect the building and residents in the event of fire and against the elements and noise pollution.

What we did

Award-winning 18,000 m2 cladding replacement programme ensures safety of 440 families in 5 high rise towers.

Specifications

  • Cladding replacement
  • Intrusive surveys
  • Detailed design
  • FRA (including Fire Safety Training)
  • Gas works
  • Concrete and steel repairs and reinforcement

Project Overview

Number of weeks

50

Contract Value

£

6.7

m

Number of tower blocks

5

Amount of cladding

18000

m2

Compliant and safe, our new cladding system met BR 135 classification (tested and certified to BS 8414), addressed the risk of rapid fire spread (to enable suitable means of escape for 440 families) whilst providing thermal and acoustic insulation and weather-proofing against the elements of the Solent river. It also offered maintenance-free envelopes aesthetically sympathetic to the original block designs.

innovations, challenges, solutions

Our re-cladding project kept 440 families safe and guaranteed compliance with new regulations for our client.

Our contractor partner Axis Europe has pulled out all the stops to engage with residents, particularly the most vulnerable, and making sure they are happy with work on their homes. The project has been held up as a best practice example of recladding work, with visits by housing associations, local authorities  and government officials.

The Hyde Group

Have a project to discuss?

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View Our Brochure

You may also be interested in...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.