Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our client

Metropolitan Police

Axis completed a £3.5m bespoke refurbishment of the Metropolitan Police Vehicle Workshops offices in 6 months

Project Details

Axis undertook a fast-track full fit out of the Metropolitan Police Ponton Road vehicle workshop and offices.

Our client had to vacate their previous building at the end of its lease and relocate their mechanics and engineers who look after the Metropolitan Police’s extensive range of vehicles.

We completed a full refurbishment of the administration block, transforming it into modern offices and welfare facilities.

Works included the installation of a new VRF cooling and heating system, full re-wire of power and data new containment, new LED lighting, plus full mechanical, electrical and plumbing installations throughout.

Works also included new access control and CCTV to the building along with external security doors and internal fire doors.

We undertook some demolition and constructed new walls for a new improved office layout.

We also fully decorated and installed new flooring throughout, including non-slip resin flooring to the workshop areas and parts stores, all designed to improve staff facilities.

The garage facilities included new high-tech Dura workstations, new vehicle lifts, exhaust extraction, compressed air and oil lines.

In addition, we installed the latest Hunter wheel alignment system and MOT Automated Test Lane (ATL, a specialised testing bay designed for one-person operation).

Our new CCTV and security alarms enhance safety and security across the entire site. Furthermore, new external LED lights added to the car park to improve visibility and safety for both staff and visitors. Access control systems across all areas ensure secure and controlled entry to the premises.

Starting in November 2024, both Axis and our supply chain partners worked extended hours and weekends to meet the tight deadlines and deliver the project on time, to facilitate the Metropolitan Police Fleet Services team being able to relocate and occupy their new premises on schedule.

Overall, this project was a major success, with Axis delivering all works to a high standard, on time, and to the full satisfaction of the Metropolitan Police.

The Workshop was officially opened on 3 September 2025 by Commissioner of the Metropolitan Police Sir Mark Rowley, QPM; and the Reverend Prebendary Sir Jonathan Osborne OBE, Senior Chaplain to the Metropolitan Police.

Benefits

  • Decarbonisation
  • Energy efficiency
  • Modernisation
  • Enhanced functionality
  • Improved efficiency in Fleet operations
  • Enhanced safety and security

Client Relationship

Axis is proud to have worked with the Metropolitan Police Service since 2013 and, to-date, we have successfully been appointed to their Lot 1 Contractor Framework for the past 3 terms.

Specifications

  • Structural alterations
  • Strip out gas fired boilers and heating systems
  • New VRF cooling and heating system decarbonisation works
  • New ceilings
  • Complete M&E strip out and renewal
  • New flooring
  • New fire doors
  • Complete passive fire stopping throughout
  • New security doors
  • Full internal decorations
  • New CCTV, access control and security alarm system
  • New LED lighting
  • Complete electrical strip-out, renewal of power/data, including distribution boards
  • Full garage fitout – mechanical vehicle lifts and tyre fitting bays/wheel alignment
  • Installation MOT automated test lane including brake testing
  • New light weight fast action speed shutters to all 12 vehicle bays

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents