Follow Us

 

Our Services

Concept is one of the UK’s leading property service specialists, delivering expert property maintenance, refurbishment and compliance across the UK.

View All Services

Frameworks

Home | Case study | Air Handling Unit Replacement – Southampton General Hospital

Air Handling Unit Replacement - Southampton General Hospital

Sector

Healthcare

Location

South East

Service

Planned Maintenance

We are replacing four air handling units on the roof of the West Ward Block at Southampton General Hospital. The ward block links directly to the Centre Block, Lab and Path Block, Blood Transfusion, and Cancer Science facilities, which required careful coordination to protect clinical operations throughout the works.

The scope includes the installation of new roof-mounted general ventilation POD units supported by bespoke steelwork. We are delivering all associated structural preparation, ductwork cleaning, targeted duct alterations, and damper adjustments to improve air distribution. A new building management system is being installed with upgraded controls, wiring, and containment, alongside new CT heating pipework connections and electrical service modifications.

What we did

Delivery of a major ventilation upgrade to improve compliance, air quality, and system control within a critical hospital environment.

Specifications

  • Replacement of four roof-mounted air handling units
  • Bespoke structural steel framework for new plant
  • New building management system with advanced controls
  • Ductwork cleaning, alterations, and damper adjustments
  • CT heating pipework connections and electrical upgrades
  • LV distribution, lighting, and control cabling upgrades
  • Fire alarm modifications and compliant fire stopping
  • Lightning protection system modifications
  • Removal of redundant mechanical and electrical services

Project Overview

Duration

Ongoing

Contract Value

£

4.4

M

The existing ventilation systems no longer met current HTM requirements, creating a need for replacement within a live healthcare setting. The rooftop location and proximity to key clinical blocks required detailed planning to manage access, sequencing, and system changeovers.

We implemented a phased approach supported by new LV supplies, control cabling, and BMS integration to ensure continuity of service. Roof plantroom modifications include new lighting, fire alarm changes, fire stopping, and updates to the lightning protection system. Redundant mechanical and electrical services are being removed to leave a clean and compliant installation that supports long-term performance and patient safety.

Innovations, challenges, solutions

We are upgrading life-critical ventilation systems while maintaining safe operation across connected hospital facilities.

Have a project to discuss?

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.