Follow Us

 

Our Services

Concept is one of the UK’s leading property service specialists, delivering expert property maintenance, refurbishment and compliance across the UK.

View All Services

Frameworks

Home | Case study | Decarbonisation & Net Zero Scheme – Rivers House

Decarbonisation & Net Zero Scheme - Rivers House

Sector

Local Authorities/Govt.

Location

South West

Service

Decarbonisation

Concept was engaged to deliver a major decarbonisation scheme at DEFRA’s Rivers House site in Blandford Forum. The aim of the programme was to remove reliance on oil-fired heating systems and transition the facility to a low-carbon, net zero operational model.

We began with the decommissioning and removal of the existing oil-fired heating plant, including associated equipment and boiler flues. The internal layout was adapted to accommodate a new buffer vessel and a low-temperature hot water system, supported by updated emitters and zonal heating controls to improve energy efficiency and user comfort. Four air source heat pumps were installed to provide low-carbon heating, supported by photovoltaic arrays mounted to the roofs of both the main and satellite buildings to generate renewable energy on site.

What we did

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to support net zero operation.

Specifications

  • Decommissioning and removal of existing oil-fired heating systems
  • Installation of four Mitsubishi electric air source heat pumps
  • Installation of photovoltaic (PV) arrays on main and satellite building roofs
  • New buffer vessel and low-temperature hot water heating system
  • Replacement heating emitters and zonal heating controls
  • Installation of new low-voltage main electrical panel
  • High-voltage cabling connection from the local road network
  • Installation of new site transformer
  • Full replacement of windows and doors with energy-efficient units

Project Overview

Number of months

27

Contract Value

£

2.3

m

The introduction of heat pumps and renewable energy systems created a higher electrical demand across the site. To address this, we carried out major power infrastructure upgrades to ensure the building could support the new systems while maintaining operational resilience.

Works included the installation of a new low-voltage main panel, the provision of high-voltage cabling from the local road network, and the installation of a new transformer to provide sufficient electrical capacity. Alongside these upgrades, the building envelope was improved through the full replacement of windows and doors with energy-efficient alternatives, which enhanced thermal performance and supported DEFRA’s long-term sustainability objectives.

Innovations, challenges, solutions

We upgraded the site’s electrical infrastructure to support new low-carbon systems and future operational demand.

Colleagues engaging in conversation at a project site, representing equality in the workplace.

Have a project to discuss?

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Refurbishment – Elizabeth Barracks

Delivery of a full refurbishment of the dining facility at Elizabeth Barracks, applying our expertise to create a modern, durable,...

Refurbishment – St George’s Church

Delivering a comprehensive refurbishment and lifecycle upgrade while safeguarding the church’s historic character.

Refurbishment – Crisis Suite

We delivered the full refurbishment and reconfiguration of an occupied office space to create a dedicated crisis communication and media...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent