Home | Case study | Refurbishment – Mablethorpe Environment Agency Depot

Refurbishment - DEFRA Mablethorpe

Sector

Local Authorities/Govt.

Location

South East

Service

Refurbishment

We began work in November 2025 with a clear strategy to maintain full operational continuity for the Environment Agency. To achieve this, we established a dedicated site compound and set up temporary accommodation for the client’s staff. This allowed the depot team to continue their daily tasks without disruption while we completed the extensive internal strip-out and structural works.

Our team completely reconfigured the building’s interior. We stripped out and replaced all mechanical and electrical services, decommissioned a redundant joinery workshop, and extended the mezzanine level to create a spacious new meeting room with skylights for natural light. On the ground floor, we built three new washroom facilities, a commercial kitchen, a breakout space, and dedicated locker and drying rooms. We also upgraded the building’s thermal and environmental performance by installing an air source heat pump system, wall and floor insulation, new fire doors, secure external steel doors, and an automated entry gate.

What we did

We delivered a comprehensive internal refurbishment of an operational Environment Agency depot to modernise the facility and create a compliant, future-proof workspace.

Specifications

  • Air source heat pump installation
  • Mezzanine extension with skylights
  • New commercial kitchen and breakout area
  • Three ground-floor washrooms
  • Locker and drying room facilities
  • Upgraded wall and floor insulation
  • CCTV, intruder, and fire alarm systems
  • Automated entry gate and steel doors
  • New structural timber joists and chipboard flooring

Project Overview

Number of months

7

Contract Value

£

560

K

During the initial strip-out, we uncovered a significant challenge: the existing upper floor structure was non-compliant and structurally unsafe. This posed a serious risk to both safety and the project timeline. We worked closely with structural specialists McAndrew Martin Ltd to design and install a completely new floor structure. This involved removing the original timber joists and installing upgraded structural members, a tongue-and-groove chipboard floor, a fire-rated partition, and a new internal staircase.

Despite the substantial increase in the scope of work, we maintained tight control over the programme. By reorganising our resources, rescheduling tasks, and working closely with the design team, we completed the project by 24 May 2026. This required only a short extension to the original deadline, ensuring the client received a fully compliant, high-quality facility with minimal delay.

Innovations, challenges, solutions

We collaborated with structural engineers to rapidly redesign and replace a non-compliant upper floor structure discovered during early demolition.

Colleagues engaging in conversation at a project site, representing equality in the workplace.

Have a project to discuss

01730 816021
info@conceptbld.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Refurbishment – Mablethorpe Environment Agency Depot

Delivery of a comprehensive internal refurbishment of an operational Environment Agency depot to modernise the facility and create a compliant,...

Refurbishment – Elizabeth Barracks

Delivery of a full refurbishment of the dining facility at Elizabeth Barracks, applying our expertise to create a modern, durable,...

Refurbishment – St George’s Church

Delivering a comprehensive refurbishment and lifecycle upgrade while safeguarding the church’s historic character.

Refurbishment – Crisis Suite

We delivered the full refurbishment and reconfiguration of an occupied office space to create a dedicated crisis communication and media...

Decarbonisation & Net Zero Scheme – Rivers House

Delivery of a full decarbonisation programme that replaced fossil fuel heating systems with low-carbon technology and upgraded building infrastructure to...

Solar PV Pump House – Pewsey Down

Delivery of an off grid solar powered pump house, replacing a diesel system with a low carbon solution suited to...

Adelphi Theatre – Roof Systems Renewal

Renewal of complex roof systems and access arrangements on a Grade II listed theatre to resolve water ingress and improve...

Hampshire Building Internal Refurbishment – Barton Peveril Sixth Form College

Delivering a large-scale internal refurbishment that enhanced learning, teaching, and social spaces while maintaining full college operations.

Internal Refurbishment – Maritime and Coastguard Agency

Delivery of a comprehensive internal refurbishment and fit-out of the MCA Swanwick facility, enhancing both functionality and aesthetics.

Alford Schools of Military Music – Refurbishment 

Delivered a full refurbishment of a historic defence facility, improving performance, compliance, and usability while protecting its character.

Sir James Matthews Building Refurbishment

Delivery of a coordinated refurbishment that upgraded study and teaching spaces to support modern learning within a busy city centre...

Building 46 Optic Lab Refurbishment – University of Southampton

Delivery of a specialist laboratory refurbishment for the University of Southampton that integrated complex mechanical and electrical systems to support...

Chapel Refurbishment – University Hospital Southampton

Delivery of a sensitive refurbishment that improved the chapel’s condition while respecting its role as a calm, inclusive space within...

Liquid Oxygen Tank Installation – Princess Anne Hospital

Delivered a purpose-built liquid oxygen tank compound, integrating mechanical, electrical, and fabric works to support hospital operations safely and efficiently.

Residential Conversion – Wyndham Court

Successful delivery of a technically complex three flat conversions from a former restaurant within an occupied residential setting, involving major...

Office Refurbishment – Marine Management Organisation

Delivery of a complete internal refurbishment to create a safe, modern, and functional office environment with minimal disruption to operations.

LINAC Removal & Installation – St Bartholomew’s Hospital

Delivered coordinated enabling works to support the safe removal of an existing LINAC and the installation of new equipment within...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

barracks family accommodation white house post works

Amey – Weeton Barracks

These works form part of CLC’s 11+ year contract with Amey which has recently been renewed to March 2029.

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...